Aktual Evaluasi Cycle Time Kesesuaian Armada Alat Gali-Muat Angkut Produksi Andesit
DOI:
https://doi.org/10.29313/bcsme.v6i1.23453Keywords:
Actual Cycle Time, Fleet Match, Produktivitas, ProduksiAbstract
Abstract. PT Winner Prima is an andesite mining company located in Banten Province that applies an open-pit mining method. Production activities depend on the performance of excavators and dump trucks, with productivity influenced by actual cycle time, equipment efficiency, and fleet match suitability. Observation results show excavator production of 35,754.07 tons per month and dump truck production of 35,330.14 tons per month, indicating an imbalance in equipment performance that affects overall production effectiveness. This study collected primary data through direct observation of operating times, including loading, dumping, maneuvering, travel time, and work delays. Secondary data included administrative maps, geological maps, satellite imagery, rainfall data, and equipment specifications. The data were analyzed to determine actual cycle time, load capacity considering fill factor and swell factor, equipment productivity, and work efficiency based on Mechanical Availability (MA), Physical Availability (PA), Use of Availability (UA), and Effective Utilization (EU). Fleet match analysis was also conducted to identify equipment waiting times. The evaluation results show that adding 2 working hours increased production to 46,432.92 tons per month for excavators and 46,631.32 tons per month for dump trucks, allowing the production target to be achieved, although it requires overtime work in accordance with regulations.
Keywords: Actual Cycle Time, Fleet Match, Productivity, Production
Abstrak. PT Winner Prima merupakan perusahaan andesit di Provinsi Banten dengan metode tambang terbuka. Kegiatan produksi sangat bergantung pada kinerja alat gali-muat dan alat angkut. Produktivitas penambangan dipengaruhi actual cycle time, efisiensi kerja alat, serta kesesuaian armada kerja (fleet match). Hasil pengamatan menunjukkan produksi excavator sebesar 35.754,07 ton/bulan dan dump truck sebesar 35.330,14 ton/bulan. Perbedaan ini mengindikasikan adanya ketidakseimbangan kinerja alat yang berdampak pada efektivitas sistem produksi secara kesuluruhan. Metode penelitian ini meliputi pengumpulan data primer melalui pengamatan langsung waktu kerja alat, seperti waktu muat, dumping, manuver, perjalanan serta hambatan kerja. Data sekunder meliputi peta administrasi, peta geologi, citra satelit, data curah hujan dan spesifikasi alat mekanis. Data tersebut diolah untuk mengetahui actual cycle time, kapasitas muat dengan mempertimbangkan Fill Factor dan Swell Factor, produktivitas alat, serta efisiensi kerja berdasarkan Mechanical Availibiility (MA), Physical Availibility (PA), Use of Availibility (UA), dan Effective Ulitization (EU). Selain itu, dilakukan analisis fleet match untuk mengidentifikasi waktu tunggu dan antrean alat. Hasil evaluasi menunjukkan bahwa penambahan jam kerja selama 2 jam mampu meningkatkan produksi menjadi 46.432,92 ton/bulan untuk excavator dan 46.631,32 ton/bulan untuk dump truck, sehingga target produksi tercapai. Namun, penambahan jam kerja termasuk kerja lembur dan menghasukan membayar upah lembur sesuai peraturan.
References
Eva Indriani Sanggalangi, Shalaho Dina Devy, & Windhu Nugroho. (2022). Analisis Pengaruh Number of Cycles Terhadap Pengujian Durabilitas Batulanau di Sidomulyo Samarinda. Jurnal Riset Teknik Pertambangan, 157–162. https://doi.org/10.29313/jrtp.v2i2.1618
Falah, A. F., Yuliadi, N., & Fauzi, I. (2025). Penentuan Zona Aquifer di Quarry Trass PT XYZ. https://journal.sbpublisher.com/index.php/minetech
Rizki Purnama, Zaenal, & Noor Fauzi Isniarno. (2021). Kajian Teknis dan Ekonomis dalam Merencanakan Penggantian Alat Angkut Lama dengan Alat Angkut Baru di Area Penambangan Andesit PT XYZ Kecamatan Cariu, Kabupaten Bogor, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 123–131. https://doi.org/10.29313/jrtp.v1i2.412
Anonim, 2018. Keputusan Menteri Energi Dan Sumber Daya Mineral Nomor 1827 K/30/MEM/2018 Tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan Yang Baik. Jakarta: Kementerian Energi dan Sumber Daya Mineral Republik Indonesia.
Anonim, 2022, “Batas Wilayah Rbi Provinsi Banten”. Kabupaten Pandeglang: Badan Informasi Geospasial.
Anonim, 2025, “Kabupaten Pandeglang Tahun 2015-2023”, Banten: Badan Pusat Statistika.
Barnes, R. M. 1997. Motion And Time Study: Measurement of Work (7th ed.). New York: John Wiley & Sons.
Darling, P. 2011. Sme Mining Engineering Handbook. Englewood: Society for Mining, Metallurgy, and Exploration.
Ebrahim, S., Al-Refaie, A., & Shanikat, M. 2012. Evaluation Of Equipment Productivity In Open Pit Mines. Journal of Mining Science, nomor 48, volume (5), Halaman 899–906. https://doi.org/10.1134/S1062739148050061.
Erkaya, H., & Tanircan, G. 2020. Optimization Of Truck–Shovel Fleet In Open-Pit Mining. International Journal of Mining Science and Technology, nomor 30, volume (6), halaman 801–810. https://doi.org/10.1016/j.ijmst.2020.05.013.
Hartman, H. L., & Mutmansky, J. M. 2002. Introductory Mining Engineering (2nd ed.). New York: John Wiley & Sons. https://doi.org/10.32502/jbearing.2842202063.
Hustrulid, W., Kuchta, M., & Martin, R. 2013. Open Pit Mine Planning And Design (3rd ed.). London: CRC Press.
Indonesianto, Y., 2005, ”Pemindahan Tanah Mekanis”, Jurusan Teknik Pertambangan, Universitas Pembangunan Nasional "Veteran" Yogyakarta, Yogyakarta.
Indri Tenri Datu, A., Rachman, A., & Saputra, R. 2023. Desain Tambang Terbuka Dan Quarry. Jurnal Teknologi Pertambangan, nomor 11, volume (2), halaman 77–85.
Kennedy, B. A. 1990. Surface Mining. Littleton: Society for Mining, Metallurgy, and Exploration.
Kusrin, 2008, "Pemindahan Tanah Mekanis Dan Alat Berat", Semarang University Press
Kementerian Tenaga Kerja dan Transmigrasi Republik Indonesia, 2005, “Peraturan Menteri Tenaga Kerja Dan Transmigrasi Nomor PER.15/MEN/VII/2005 Tentang Waktu Kerja Dan Istirahat Pada Sektor Usaha Pertambangan Umum Pada Daerah Operasi Tertentu”, Jakarta.
Ladianto, H. Z., & Ernawati, R., 2019, "Evaluasi Produktivitas Alat Muat Dan Alat Angkut Untuk Memenuhi Target Produksi Bulanan Pengupasan Overburden Pada Penambangan Nikel Di Blok B Pt. Paramitha Persada Tama Provinsi Sulawesi Tenggara", Jurnal Magister Teknik Pertambangan Universitas Pembangunan Nasional Veteran Yogyakarta, Semitan I, halaman 1–6
Nday, J., & Thomas, H. 2019. Production System And Mining Heavy Equipment Management. Mining Engineering Review Journal, nomor 7, volume (1), halaman 12–22.
Niebel, B. W., & Freivalds, A. 2009. Engineering Work Measurement (12th ed.). New York: McGraw-Hill.
Oemiati, N., Revisdah, R., & Rahmawati, R., 2020, "Analisa Produktivitas Alat Gali Muat Dan Alat Angkut Pada Pengupasan Lapisan Tanah Penutup (Overburden)", Bearing : Jurnal Penelitian Dan Kajian Teknik Sipil,nomor 6, volume (3). https://doi.org/10.32502/jbearing.2842202063.
Peurifoy, R. L., & Ledbetter, W. B. 1985. Construction Planning, Equipment, And Methods (4th ed.). New York: McGraw-Hill.
Runge, I. C.1998. Mining Economics And Strategy. Littleton: Society for Mining, Metallurgy, and Exploration.
Salim, R. 2020. Pengaruh Geometri Jalan Terhadap Kinerja Produksi Alat Angkut Pada Tambang Terbuka. Jurnal Teknik Sipil, nomor 12, volume (3), halaman 201–210.
Singh, S. P., & Narendrula, R. 2006. Factors Affecting Productivity Of Dump Trucks In Surface Mines. Mining Technology, nomor 115, volume (1), halaman 1–8. https://doi.org/10.1179/174328606X101639.