Produktivitas Excavator Class PC-2500 dan PC-2000 pada Pembuatan Temporary Sump Paris Barat

  • Zaky Zakaria Al Kautsar Teknik Pertambangan, Fakultas Teknik, Universitas Islam Bandung
  • Noor Fauzi Isniarno Fakultas Teknik, Universitas Islam Bandung
  • Yunus Ashari Teknik Pertambangan, Fakultas Teknik, Universitas Islam Bandung
Keywords: Efisiensi Kerja, Produktivitas, Produksi

Abstract

Abstract. PT Adaro Indonesia will be in the area of Overburden Loading and Temporary Sump Manufacturing West Paris Bottom Pit South Tutupan. West Paris Sump will be excavated with mud, so a temporary sump is needed to accommodate the water that must be diverted from the West Paris Sump during the mud excavation. So it is necessary to select mechanical tools so that the manufacture of temporary sump can be completed in May 2024. The data analysis technique carried out in this study is by using a comparative method. This comparative method compares two data for a problem-solving approach. This study compares data on work efficiency, productivity and production results from overload loading using excavator class PC-2500 and PC-2000. The productivity and production of the excavation equipment can be determined by collecting data on cycle time, material density, fill factor, swell factor, and drag time. The productivity of the PC-2500 is 712,24 Bcm/hour/tool with a production of 13.209,37 BCM/day, then the formation of a temporary sump with a material volume that must be loaded of 123.838,356 BCM will be completed within 9 days. The productivity of the excavator equipment class PC-2000 is 888,16 Bcm/hour/tool with a production of 18.873,07 BCM/day, then the formation of temporary sump will be completed within 7 days. The construction of the West Paris temporary sump using the PC-2000 class excavator could not be completed within 7 days. Due to the large amount of time obstacles that occur such as rain obstacles which on average reach 104,80 minutes/day, causing the efficiency of the equipment to be 84,53%.

Abstrak. PT Adaro Indonesia akan area Pemuatan Overburden dan Pembuatan Temporary Sump Paris Barat Bottom Pit South Tutupan. Sump Paris Barat akan dilakukan penggalian lumpur, maka diperlukan sump sementara (temporary sump) untuk menampung air yang harus dialihkan dari Sump Paris Barat selama penggalian lumpur dilakukan. Sehingga diperlukan pemilihan alat mekanis agar pembuatan temporary sump dapat terselesaikan pada bulan Mei 2024. Teknik analisis data yang dilakukan pada penelitian kali ini yaitu dengan menggunakan metode komparatif. Metode komparatif ini membandingkan dua data untuk dilakukan pendekatan penyelesaian masalah. Penelitian ini membandingkan data efisiensi kerja, produktivitas dan produksi hasil dari pemuatan overburden dengan menggunakan alat gali-muat excavator class PC-2500 dan PC-2000. Produktivitas dan produksi alat gali-muat tersebut dapat diketahui dengan melakukan pengambilan data cycle time, density material, fill factor, swell factor, dan waktu hambatan. Produktivitas dari PC-2500 sebesar 712,24 Bcm/jam/alat dengan produksi sebesar 13.209,37 BCM/Hari, maka pembentukan temporary sump dengan volume material yang harus dimuat sebesar 123.838,356 BCM akan terselesaikan dalam waktu 9 hari. Produktivitas alat excavator class PC-2000 sebesar 888,16 Bcm/jam/alat dengan produksi sebesar 18.873,07 BCM/Hari, maka pembentukan temporary sump akan terselesaikan dalam waktu 7 hari. Pembuatan temporary sump paris barat dengan menggunakan alat excavator class PC-2000 tidak dapat terselesaikan dalam waktu 7 hari. Dikarenakan banyaknya waktu hambatan yang terjadi seperti hambatan hujan yang rata-rata mencapai 104,80 menit/Hari, menyebabkan efisiensi alat menjadi 84,53%.

References

Abdulah, Ashari, Y., & Maryanto. (2021). Rencana Produksi Pengangkutan Overburden Berdasarkan Pola Hujan di PT X Site Asam-Asam, Desa Riam Andungan, Kecamatan Kintap, Kabupaten Tanah Laut, Provinsi Kalimantan Selatan. Jurnal Riset Teknik Pertambangan, 1(1), 8–21. https://doi.org/10.29313/jrtp.v1i1.28

Dandi Maulana, & Solihin. (2022). Analisis Lamanya Penimbunan Terhadap Swabakar pada Stockpile Produk Batubara PT. XYZ. Jurnal Riset Teknik Pertambangan, 99–106. https://doi.org/10.29313/jrtp.v2i2.1191

Dika Hadi Anugrah, Dono Guntoro, & Yunus Ashari. (2022). Estimasi Sumberdaya Batugamping di PT X, Kecamatan Palimanan, Kabupaten Cirebon, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 148–154. https://doi.org/10.29313/jrtp.v1i2.538

Dynand, R. R., Linda Pulungan, & Rully Nurhasan. (2022). Evaluasi Produksi Crushing Plant Batu Andesit di PT. XYZ Pamoyanan Purwakarta. Jurnal Riset Teknik Pertambangan, 141–146. https://doi.org/10.29313/jrtp.v2i2.1412

Embun Alicia Amoret, Yunus Ashari, & Dono Guntoro. (2024). Evaluasi K3 dengan Metode Analytic Hierarchy Process pada PT. Silva Andia Utama. Jurnal Riset Teknik Pertambangan, 116–124. https://doi.org/10.29313/jrtp.v4i2.5213

Imam Imadudin, Elfida Moralista, & Zaenal. (2021). Kajian Sisa Umur Pakai dan Proteksi Katodik Sistem Anoda Korban pada Pipa Transportasi Gas Pipeline B di Kecamatan Cilamaya Wetan, Kabupaten Karawang, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 117–122. https://doi.org/10.29313/jrtp.v1i2.408

Muhammad Abizard Rizki, Yunus Ashari, & Indra Karna Wijaksana. (2022). Pengujian Akuifer Sumur Produksi untuk Memenuhi Kebutuhan Pabrik Pengolahan Zircon. Jurnal Riset Teknik Pertambangan, 31–39. https://doi.org/10.29313/jrtp.v2i1.993

Muhammad Fahmi, & Zaenal. (2022). Perancangan Desain Pit Penambangan Batubara untuk Memenuhi Target Produksi pada PT. X. Jurnal Riset Teknik Pertambangan, 24–30. https://doi.org/10.29313/jrtp.v2i1.787

Rafly Aditya Pratama, Solihin, & Yunus Ashari. (2024). Analisis Kinerja Crushing Plant untuk Mencapai Target Produksi Batu Andesit. Jurnal Riset Teknik Pertambangan, 103–108. https://doi.org/10.29313/jrtp.v4i2.5030

Rizky Noor Fitriadi, Iswandaru, & Elfida Moralista. (2024). Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut. Jurnal Riset Teknik Pertambangan, 41–48. https://doi.org/10.29313/jrtp.v4i1.3821

Shoffan Shofa Hamdan Nurullah, Dono Guntoro, & Indra Karna Wijaksana. (2024). Pengaruh Geometri Jalan terhadap Produktivitas Batubara di Pit 2 Banko. Jurnal Riset Teknik Pertambangan, 83–92. https://doi.org/10.29313/jrtp.v4i1.3897

Tampubolon, A. (2023). Optimasi Biaya Produksi Overburden dan Kaksa Menggunakan Program Linear dan Bunching Effect. Jurnal Riset Teknik Pertambangan, 27–34. https://doi.org/10.29313/jrtp.v3i1.1752

Ilahi, R.R., 2014, “Kajian teknis produktivitas alat gali-muat (excavator) dan alat angkut (dump truck) pada pemuatan tanah penutup bulan September 2013 di pit 3 Banko Barat PT. Bukit Asam (Persero) Tbk UPTE”, Jurnal Ilmu Teknik, Vol 2 (3).

Kalengkongan, B.B., dkk., 2020, “Analisa Perhitungan Produktivitas Alat Berat Pada Pekerjaan Pematangan Lahan Pembangunan Tower Sutet Likupang-Paniki”, Jurnal Sipil Statik, Vol 8 (1).

Mahesa, R.T., dkk., 2021, “Keserasian Alat Gali Muat dan Alat Angkut Dalam Meningkatkan Produktivitas Pengupasan Overburden Pada Pit Utara PT. Bara Prima Pratama Jobsite Batu Ampar, Kabupaten Indragiri Hilir, Provinsi Riau”, Bina Tambang, Vol 6 (5), 124-130

Nurhakim., 2004, “Modul Ajar Pemindah Tanah Mekanis”, Program Studi Teknik Pertambangan, Universitas Lampung Mangkurat, Banjarbaru.

Oemiati, N., dkk., 2020, “Analisa Produktivitas Alat Gali Muat Dan Alat Angkut Pada Pemuatan Lapisan Tanah Penutup (Overburden)”, Bearing Jurnal Penelitian dan Kajian Teknik Sipil, Vol 6 (3), 194-207.

Prodjosumarto, P., 1995, “Pemindahan Tanah Mekanis”, Departemen Tambang Institut Teknologi Bandung, Bandung.

Prodjosumarto, P., 1993, “Tambang Terbuka (Surface Mining)”, Departemen Pertambangan, Institut Teknologi Bandung, Bandung.

Rianto, D.J., dan Aldiansyah, Y., 2023, “Ketersediaan Jumlah Alat Angkut Nissan CWB 450 Dalam Melayani Excavator Caterpillar 320D Pada Kegiatan Penambangan Batubara Dan Dampak Yang Mempengaruhinya”, Jurnal Inovasi Penelitian, Vol 3 (9), 7741-7750.

Sefrizni, A., dan Kasim, T., (2019), “Analisis Kebutuhan Alat Gali Muat dan Alat Angkut Menggunakan Simulasi Teori Antrian Pada Produksi Overburden di PT. Haswi Kencana Indah Kecamatan Sumay, Kabupaten Tebo Provinsi Jambi”, Journals Mining Engineering : Bina Tambang, Vol 4 (3), 260-270, Bina Tambang.

Tenriajeng, A.T., 2003. “Pemindahan Tanah Mekanis”. Jakarta: Gunadarma Nurrahman, A. A. (2024). Rancangan Sistem Rekomendasi Pemilihan Jurnal Ilmiah Nasional di Laman Sinta. Conference on Electrical Engineering, Informatics, Industrial Technology, and Creative Media 2024, 1304–1308. https://conferences.ittelkom-pwt.ac.id/index.php/centive/article/view/326.

Worlanyo, A.S., Jiangfeng, L. 2021, “Evaluating the environmental and economic impact of mining for post-mined land restoration and land-use A review”, Journal of Environmental Management, 279, 111623.

Zarly, Y.F., dan Kasim, T., 2019, “Kajian Teknis Loading dan Hauling Produksi Overburden pada Tambang Terbuka PT. Allied Indo Coal Jaya, Parambahan, Sawahlunto”, Bina Tambang, Vol 4 (1), 320-330.

Published
2025-02-03