Rencana Teknis Pemanfaatan Lahan Bekas Penambangan Batuan Andesit PT XYZ di Desa Batubalak, Kecamatan Rajabasa, Kabupaten Lampung Selatan, Provinsi Lampung
DOI:
https://doi.org/10.29313/bcsme.v4i2.14396Keywords:
Jembata Kaca, Arsitektur, PascatambangAbstract
Abstract. PT XYZ is a company operating in the field of andesite mining located in Lampung Province. Companies must plan reclamation and post-mining by ESDM Ministerial Regulation No. 7 of 2014 concerning Reclamation and Post-mining. Supported by adequate landscape conditions, namely directly facing the open sea, it allows the use of ex-mining land as a tourist attraction. This post-mining program is expected to build the economy of the surrounding community. In the research area, a tourist attraction in the form of a glass bridge and Gazebo Hill will be built. The research focuses on technical plans including layout planning (landscape architecture), architecture, and design of main tourist attractions by paying attention to simple civil engineering aspects. The regulations include Indonesian National Standards, Ministerial Decrees/Regulations, and Government Regulations. This construction work is targeted to be carried out over 6 months. The calculation results for the main material requirements are 596,238 LCM of sand, 256,512 LCM of split 10 - 20 mm, 630,023 LCM of 20 - 30 mm split, 16,026 zak of cement, 6,040 reinforcing steel, 617 m2 of laminated glass, 617 m2 of wooden poles. 50 pieces measuring 25 x 25 x 350 (cm), 50 wooden roof frames measuring 25 x 25 x 400 (cm), 30 m2 zinc roof. Meanwhile, heavy equipment needs include 1 unit of Concrete Mixer Truck, 1 unit of Concrete Pump, 1 unit of Concrete Vibrator, 1 unit of Mobile Crane, 2 units of Excavator, 5 units of Dump Truck, and 1 unit of Bulldozer. The total workforce will require 153 people.
Abstrak. PT XYZ merupakan perusahaan yang bergerak di bidang pertambangan andesit yang berlokasi di Provinsi Lampung. Perusahaan memiliki kewajiban untuk melakukan perencanaan reklamasi dan pascatambang sesuai dengan Peraturan Menteri ESDM No. 7 Tahun 2014 tentang Reklamasi dan Pascatambang. Didukung dengan kondisi bentang alam yang memadai yaitu berhadapan langsung dengan laut lepas, memungkinkan pemanfaatan lahan bekas tambang sebagai objek wisata. Program pascatambang ini diharapkan dapat membangun perekonomian masyarakat sekitar. Pada daerah penelitian direncanakan akan dibangun objek wisata berupa Jembatan Kaca dan Bukit Gazebo. Penelitian difokuskan pada rencana teknis meliputi perencanaan tata letak (arsitektur bentang alam), arsitektur dan perancangan objek wisata utama dengan memperhatikan aspek teknik sipil sederhana. Regulasi yang digunakan antara lain Standar Nasional Indonesia, Keputusan/Peraturan Menteri, Peraturan Pemerintah, dan lain-lain. Pekerjaan konstruksi ini ditargetkan dapat dilaksanakan selama 6 bulan. Pekerjaan pembangunan ini targetnya akan dilaksanakan selama 6 bulan. Adapun hasil perhitungan untuk kebutuhan bahan utama, yaitu Pasir sebanyak 596,238 LCM, Split 10 – 20 mm sebanyak 256,512 LCM, Split 20 – 30 mm sebanyak 630,023 LCM, Semen sebanyak 16.026 zak, Baja tulangan sebanyak 6.040 batang, Kaca Laminasi sebanyak 617 m2, Tiang Kayu ukuran 25 x 25 x 350 (cm) sebanyak 50 buah, Kerangka Atap Kayu ukuran 25 x 25 x 400 (cm) sebanyak 50 batang, Atap Seng seluas 30 m2. Sedangkan untuk kebutuhan alat berat diantaranya Concrete Mixer Truck sebanyak 1 unit, Concrete Pump sebanyak 1 unit, Concrete Vibrator sebanyak 1 unit, Mobile Crane sebanyak 1 unit, Excavator sebanyak 2 unit, Dump Truck sebanyak 5 unit, dan Bulldozer sebanyak 1 unit. Untuk tenaga kerja sendiri total akan membutuhkan 153 orang.
References
Anonim. 2002, SNI 07-2052-2002 tentang Baja Tulangan Beton, Badan Standarisasi Nasional.
Anonim, 2004, RSNI T-12-2004 tentang Perencanaan Struktur Beton, Badan Standarisasi Nasional.
Anonim, 2007a, SNI DT-91-0006-2007 tentang Tata Cara Perhitungan Harga Satuan Pekerjaan Tanah Untuk Konstruksi Bangunan Gedung dan Perumahan, Badan Standarisasi Nasional.
Anonim, 2007b, SNI DT-91-0008-2007 mengenai Tata Cara Perhitungan Harga Satuan Pekerjaan Beton untuk Konstruksi Bangunan Gedung dan Perumahan, Badan Standarisasi Nasional.
Anonim, 2008, SNI 7394:2008 tentang Tata Cara Perhitungan Harga Satuan Pekerjaan Beton Untuk Konstruksi Bangunan Gedung dan Perumahan, Badan Standarisasi Nasional.
Anonim, 2010, PP Nomor 78 tahun 2010 tentang Reklamasi dan Pascatambang, Kementerian Kesekretariatan Negara.
Anonim, 2014, Permen ESDM RI Nomor 7 Tahun 2014 Tentang Pelaksanaan Reklamasi dan Pascatambang pada Kegiatan Usaha Pertambangan Mineral dan Batubara (p. Pasal 12 Ayat 5), Kementerian ESDM RI.
Anonim, 2017, SNI 2052:2017 tentang Baja Tulangan Beton, Badan Standarisasi Nasional.
Anonim, 2018a, Kepmen ESDM RI Nomor 1827 Tahun 2018 Tentang Pedoman Pelaksanaan Kaidah Pertambangan yang Baik, Kementerian ESDM RI.
Anonim, 2018b, Peraturan Menteri ESDM RI Nomor 26 Tahun 2018 Tentang Pelaksanaan Kaidah Pertambangan yang Baik dan Pengawasan Pertambangan Mineral dan Batubara, Kementerian ESDM RI.
Anonim, 2019, SNI 2847 Tahun 2019 Tentang Persyaratan Beton Struktural Untuk Bangunan, Badan Standarisasi Nasional.
Anonim, 2020, Undang-Undang Nomor 3 Tahun 2020 tentang Pertambangan Mineral dan Batubara, Kementerian Kesekretariatan Negara.
Anonim, 2022, Spesifikasi Khusus Interim Mengenai Kaca Laminasi Dengan Perkuatan SGP Untuk Lantai Jembatan dan Lainnya SKh-1.8.16, Kementerian PUPR RI.
Asyurhok, D. S., Ashari, I., & Suparjo, S. 2014, Produktivitas Pengecoran Ready-Mixed dengan Concrete Pump dan Tower Crane, Spektrum Sipil, 1(1), 13–20. http://spektrum.unram.ac.id/index.php/Spektrum/article/view.
Suhirkam, D., 2014, Beton Mutu K-400 Dengan Penambahan Abu Sekam Padi Dan Superplastisizer, PILAR Jurnal Teknik Sipil, 10(1), 92–98.
Rana Antariksa D, Yuliadi, and Zaenal, “Rancangan Geometri Rencana Lereng Akhir Waste Dump terhadap Displacment Batuan Dasar Area Waste Dump PT X Kecamatan Palimanan, Kabupaten Cirebon, Provinsi Jawa Barat,” Jurnal Riset Teknik Pertambangan, vol. 1, no. 1, pp. 22–29, Jul. 2021, doi: 10.29313/jrtp.v1i1.29.
Dedi Saputra, Yunus Ashari, and Aviasti, “Penerapan Sistem Manajemen Keselamatan Pertambangan di Tambang Andesit PT. Gunung Kulalet Bandung,” Jurnal Riset Teknik Pertambangan, pp. 35–40, Jul. 2023, doi: 10.29313/jrtp.v3i1.2109.