Optimasi Waktu Hambatan Kinerja Primary Crusher dalam Memproduksi Batugamping 2500 Ton per Jam pada PT Indocement Tunggal Prakarsa, Kecamatan Cileungsi, Kabupaten Bogor, Provinsi Jawa Barat

  • Muhammad Naufal Fitrananda Teknik Pertambangan, Fakultas Teknik
  • Solihin Universitas Islam Bandung
  • Dudi Nasrudin Usman Universitas Islam Bandung
Keywords: Crusher, Efisiensi Kerja, Optimasi Produksi

Abstract

Abstract. PT Indocement Tunggal Prakarsa is one of the largest cement factories in Indonesia on a national scale which has 9 crushing plant units to meet production targets every day. In March, the failure to achieve the predetermined production target became the main focus in improving performance, especially in optimizing crusher performance. So there is a need for evaluation and improvement in the crusher performance process, this will greatly determine the success of the crushing process so that the expected targets will be achieved. The research was carried out at PT Indocement Tunggal Prakarsa in the P-12 unit, namely Primary Crushing using a Double Shaft Hammer Crusher with a design capacity of 3000 tons/hour with a production target of 2500 tons/hour and then the product flowed onto a conveyor belt to the stone warehouse. In March, production was only 1932.21 tons/hour with a crusher working efficiency of 61.19%. The factors causing the production target not to be achieved were the waiting time of 0.89 hours/shift and repair time of 0.99 hours/shift. Optimization activities are carried out by handling the crusher feed size, adding feed to the crusher, adding product material storage areas and reducing bottleneck times. After carrying out optimization, production was obtained at 2609.1 tons/hour, and tool work effectiveness was 86.71%.

Abstrak. PT Indocement Tunggal Prakarsa merupakan salah satu pabrik semen terbesar di Indonesia dalam skala nasional yang memiliki 9 unit crushing plant untuk memenuhi target produksi setiap harinya. Pada bulan Maret tidak tercapainya target produksi yang sudah ditentukan menjadi fokus utama dalam perbaikan kinerja terutama dalam pengoptimalan kinerja cruhser. Sehingga perlu adanya evaluasi serta perbaikan dalam proses kinerja crusher, hal ini akan sangat menentukan keberhasilan proses peremukan sehingga akan dicapai target yang diharapkan. Penelitian dilakukan di PT Indocement Tunggal Prakarsa pada unit P-12 yaitu Primary Crushing dengan menggunakan Double Shaft Hammer Crusher dengan kapasitas desain 3000 ton/jam dengan target produksi sebesar 2500 ton/jam yang kemudian produk dialirkan ke belt conveyor menuju gudang batu. Pada bulan Maret produksi hanya sebesar 1932,21 ton/jam saja dengan efisiensi kerja alat crusher 61,19%. Adapun faktor penyebab tidak tercapainya target produksi karena waktu tunggu sebesar 0,89 jam/shift dan waktu perbaikan 0,99 jam/shift. Adapun kegiatan optimasi dilakukan dengan melakukan penanganan pada ukuran feed crusher, penambahan umpan pada crusher, penambahan tempat penampungan material produk dan pengurangan waktu hambatan. Setelah melakukan optimasi didapatkan produksi sebesar  2609,1 ton/jam, dan efektivitas kerja alat sebesar 86,71%.

References

Adha A, Safaruddin, Indah B.P. 2021. “Evaluasi Teknis Crushing Plant Untuk Mencapai Target Produksi Batu Kapur Di PT Semen Baturaja (Persero)”

Afsar, Jalal. 2012. “Cement Manufacturing Process”

Dores, 2018. “Evaluasi Kinerja Crushing Plant Untuk Mencapai Target Produksi andesit 80.000 Ton/Bulan di PT Mitra Multi Sejahtera Desa Mekarsari, Kecamatan Cikalong Kulon, Kabupaten Cianjur, Provinsi Jawa Barat”

Fauzy, Isnan. 2017. “Analisis Produksi Crushing Plant dalam Pencapaian Target Produksi Andesit di CV Panghegar Mitra Abadi Desa Lagadar, Kecamatan Margaasih, Kabupaten Bandung, Provinsi Jawa Barat”

Gupta, Ashok. 2016. “Mineral Processing Design an Operation: an Introduction”, Elsevier: USA

Mailinda,dkk., 2015, “Sintesa Hydroxyapatite (Ca10(PO4)6(OH)2) Berbasis Batu Kapur”. Jurnal Penelitian Fisika dan Aplikasinya (JPFA), 5(1), hal. 23-78.

Nur Fitriana, Vinda, 2015, “Sintesis dan Karakterisasi Superkapasitor berbasis Nanokomposit TiO2/C”, Malang: Universitas Negeri Malang.Prodjosumarto, P., 1993, “Pemindahan Tanah Mekanis”, Teknik Pertambangan, Institut Teknologi Bandung.

Rahmat, Niko. 2014. “Kajian Teknis Produktivitas Crushing & Conveying dari Lime Stone Crusher II Untuk Memenuhi Target Produksi di Storage IV PT Semen Padang”, Padang: UNP

Rahmat, Wendi. 2020. “Analisis Kinerja Crusher dan Support Pada Tambang Batugamping (Dolomite) untuk Meningkatkan target Produksi di Unit Pengolahan PT Bakapindo, Tilatang Kamang, Agam, Sumatera Barat”

Rahmawatie, Budhy. 2017. “Pengendalian Kualitas Produk Klinker Pada PT. XYZ dengan Menggunakan Grafik¬ T2 Hotteling”

Saffaruddin, dkk., “ANALISIS KERJA UNIT HAMMER CRUSHER UNTUK MENCAPAI TARGET PRODUKSI BATU KAPUR DI PT. SEMEN BATURAJA (PERSERO), TBK “, Jurnal Kotamo, 1(4), hal. 7-16.

Sanjaya, Fahmy, dkk., 2019, “ Variasi Batugamping Di Quarry X Formasi Klapanunggal, Daerah Cibinong, Kecamatan Cibinong, Kabupaten Bogor, Jawa Barat “ Jurnal Geosains Padjajaran, 3(5), hal. 340-341.

S.L. Tobing, Ir, 2005. “Pengolahan Bahan Galian”, Dirjen Pertambangan Umum PPTP: Bandung.

Yuliandra, 2017. “Evaluasi Kinerja Rubber Belt Conveyor untuk Memenuhi Kebutuhan Tonase Silica Stone di PT Semen Padang”, Padang: UNP

Van Zuidam, R.A., 1985, “Aerial Photo – Interpretation in Terrain Analysis and Geomorphologic Mapping”, The Hague, Smith Publisher.

Ziaurrahman, Irvanda., 2017, “Kajian Teknis Rangkaian Peremukan Untuk Peningkatan Produksi Batugamping Pada Pabrik Peremuk P-12 Blok 3 Kuari D PT Indocement Tunggal Prakarsa Tbk. Citeureup, Bogor, Jawa Barat”, Yogyakarta: UPN.

Dika Hadi Anugrah, Dono Guntoro, & Yunus Ashari. (2022). Estimasi Sumberdaya Batugamping di PT X, Kecamatan Palimanan, Kabupaten Cirebon, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 148–154. https://doi.org/10.29313/jrtp.v1i2.538

M. Hafizh Eliansyah, Sriyanti, & Elfida Moralista. (2022). Evaluasi Kinerja Crushing Plant di PT X Desa Cipinang, Kecamatan Rumpin, Kabupaten Bogor, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 132–139. https://doi.org/10.29313/jrtp.v1i2.536

Tampubolon, A. (2023). Optimasi Biaya Produksi Overburden dan Kaksa Menggunakan Program Linear dan Bunching Effect. Jurnal Riset Teknik Pertambangan, 27–34. https://doi.org/10.29313/jrtp.v3i1.1752

Published
2024-08-14